By Kontrolmatik, the rehabilitation works for two 2720 kVA generators have been successfully completed, including the renewal of excitation systems, modernization of synchronization systems, upgrade of generator protection systems, and replacement of generator output circuit breakers.
Within the scope of the project, the installation of a SCADA system for energy monitoring and control for both generators was also completed, along with the supply and commissioning of battery/charger (rectifier) and power supply systems. All engineering, procurement, on-site installation, system integration, testing, and commissioning activities were carried out in compliance with international standards.
As a result of the modernization works, the operational reliability, synchronous operation capability, and system monitoring and traceability of the generator systems have been significantly enhanced.