Kirazlik Hydroelectric Power Plant Automation and Electrification Systems
Employer
TEİAŞ
Scope of Work
Generator Protection System, Transformer Protection System, Low Voltage Panels, MCC Panels, Synchronisation System, Battery-UPS System, SCADA System Engineering, Design, Procurement/Manufacturing, Installation and Testing and Commissioning
Sector
Energy
Location
Siirt, Türkiye
Project Duration
2021 - 2022
About Project
Generator Protection System, Transformer Protection System, Low Voltage Panels, MCC Panels, Synchronisation System, Battery-UPS System, SCADA System Engineering, Design, Procurement/Manufacturing, Installation and Testing and Commissioning.