Oslomej Solar Power Plant 110/20 kV Substation
Employer
Fortis Energy
Scope of Work
Engineering, Design, Manufacturing, Procurement, Installation and Testing and Commissioning
Sector
Energy
Location
North Macedonia
Project Duration
2022
About Project
110/20kV Turnkey Step Up Substation for Solar Power Plant in Oslomej, North Macedonia including Engineering, Design, Fabrication, Supply, Installation and Testing and Commissioning.
-Supply of HV equipment, Control protection system, SCADA system and installation and T&C of 110 kV substation.