Sonuç bulunamadı!...
Walvis Bay Namibya Power Plant
Sector
Energy
Location
Namibia
Project Duration
1 Year

Project About

As Kontrolmatik, we successfully strengthened the energy infrastructure of the Anixas-II Project with advanced engineering solutions. Within the scope of the project, MV GIS and LV switchgear systems, auxiliary transformers, NER, UPS, and DC systems were fully integrated, and more than 100 km of power and control cable installations were completed to ensure safe and uninterrupted energy distribution.

 

In addition, CCTV and fire detection systems were implemented to enhance site safety, while RTU integration enabled automation and remote monitoring capabilities. All testing and commissioning activities were completed in line with the project schedule, demonstrating Kontrolmatik’s strong engineering expertise and proven ability to deliver complex energy infrastructure projects on time and to the highest standards.

News
As Kontrolmatik Teknoloji, we aim to continuously enhance stakeholder value through the implementation of corporate governance in investor relations, in line with international standards.
View all